Upper Paung Laung

Download PDF data sheet
Upper Paung Laung completed
Upper Paung Laung completed

Particulars

Owner: unknown

Designer: AF-Colenco Ltd.

Contractor: DHPI, HTCT, MSP, YMEC

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 1300 m3x106

Height: 103 metres

Length: 530 metres

Volume of RCC: 936 m3x103

Total volume: 1100 m3x103

Construction Dates

Start of Project: 01/06 (January 2006)

Start of RCC: 01/11 (January 2011)

End of RCC: 12/13 (December 2013)

End of Project: /14 ( 2014)

Country: Myanmar

River: Paung Laung

DMS Co-ordinates: 19˚45'22.59"N, 96˚35'37.3"E

DD Co-ordinates: 19.756275, 96.593697

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
140Natural pozzolan (ASTM Class N)