SEARCHING
... please wait

Upper Yeywa (Kyaukme)

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: Lahmeyer/Stucky - AFRY

Contractor: DHPI

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 341 m3x106

Height: 102 metres

Length: 266 metres

Volume of RCC: 532 m3x103

Total volume: 580 m3x103

Construction Dates

Start of Project: /15 ( 2015)

Start of RCC: 11/22 (November 2022)

End of RCC: 10/25 (October 2025)

End of Project: 06/26 (June 2026)

Country: Myanmar

River: Myitnge

DMS Co-ordinates: 22˚1'45"N, 96˚57'50"E

DD Co-ordinates: 22.029167, 96.96389

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.80RCC against formwork (GEVR/GE-RCC)  [stepped face]

Spillway

SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type