SEARCHING
... please wait

Vadeni

Download PDF data sheet
Vadeni completed
Vadeni completed

Particulars

Owner: unknown

Designer: Institutul de Studii si Proiectari Hidroenergetice (ISPH) Bucuresti

Contractor: SC Hidroconstructia SA - Jiu Branch

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 5 m3x106

Height: 25 metres

Length: 55 metres

Volume of RCC: 14 m3x103

Total volume: 17 m3x103

Construction Dates

Start of Project: 03/86 (March 1986)

Start of RCC: 05/88 (May 1988)

End of RCC: 10/88 (October 1988)

End of Project: 10/92 (October 1992)

Country: Romania

River: Jiu

DMS Co-ordinates: 45˚3'28.11"N, 23˚16'8.69"E

DD Co-ordinates: 45.057808, 23.269081

Facings

Upstream

SlopeType
 Reinforced conventional concrete cast after RCC placement

Downstream

SlopeType
 Reinforced conventional concrete cast after RCC placement

Spillway

SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300900

Cementitious material

Cement (kg/m3)
125
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -