Wangkeng
Download PDF data sheet
Particulars
Owner: unknown
Designer: Fujian Provincial Institute of Water Conservancy and Hydropower Survey and Design
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 15 m3x106
Height: 56 metres
Length: 159 metres
Volume of RCC: 38 m3x103
Total volume: 40 m3x103
Construction Dates
Start of Project: —/01 (— 2001)
Start of RCC: —/02 (— 2002)
End of RCC: —/03 (— 2003)
End of Project: —/04 (— 2004)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Low-lime flyash (ASTM Class F) | |