Particulars

Owner: unknown

Designer: Mid-South China Insitute of Investigation, Design and Research for Hydropower Projects

Contractor: 7th Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower / Navigation

Reservoir capacity: 378 m3x106

Height: 65 metres

Length: 238 metres

Volume of RCC: 141 m3x103

Total volume: 376 m3x103

Construction Dates

Start of Project: 08/01 (August 2001)

Start of RCC: 11/02 (November 2002)

End of RCC: 05/03 (May 2003)

End of Project: 05/04 (May 2004)

Country: China

River: Youshui

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.75Reinforced conventional concrete cast after RCC placement

Spillway

SlopeType
ogeeReinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
86
68
Pozzolan (kg/m3)Pozzolan Type
103Low-lime flyash (ASTM Class F)
83