Weihou
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Thin Arch
Purpose(s): Hydropower
Reservoir capacity: 133 m3x106
Height: 82 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 03/05 (March 2005)
Start of RCC: —/06 (— 2006)
End of RCC: 04/08 (April 2008)
End of Project: —/09 (— 2009)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
