SEARCHING
... please wait

Wunonglong

Download PDF data sheet
Wunonglong completed
Wunonglong completed

Particulars

Owner: unknown

Designer: Northwest Engineering Corporation Ltd.

Contractor: SinoHydro Construction Bureau Nº8 Co. Ltd.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 284272 m3x106

Height: 138 metres

Length: 247 metres

Volume of RCC: unknown

Total volume: unknown

Construction Dates

Start of Project: 06/10 (June 2010)

Start of RCC: /15 ( 2015)

End of RCC: /17 ( 2017)

End of Project: /18 ( 2018)

Country: China

River: Lancang (Mekong)

DMS Co-ordinates: 27˚55'49.12"N, 98˚56'1.75"E

DD Co-ordinates: 27.930311, 98.933823

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type