SEARCHING
... please wait

Wyaralong

Download PDF data sheet
Wyaralong completed
Wyaralong completed

Particulars

Owner: unknown

Designer: Wyaralong Dam Alliance (partner design Companies are Hydro Tasmania, SMEC & Paul Rizzo & Associates)

Contractor: Wyaralong Dam Alliance (partner Contractor Companies are MacMahons, ASI & Wagners)

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: 1 m3x106

Height: 48 metres

Length: 464 metres

Volume of RCC: 173 m3x103

Total volume: unknown

Construction Dates

Start of Project: 09/09 (September 2009)

Start of RCC: 04/10 (April 2010)

End of RCC: 12/10 (December 2010)

End of Project: 06/11 (June 2011)

Country: Australia

River: Teviot Brook

DMS Co-ordinates: 27˚54'31.53"S, 152˚52'57.40"E

DD Co-ordinates: -27.908758, 152.882614

Facings

Upstream

SlopeType
 Traditional concrete against formwork

Downstream

SlopeType
 Traditional concrete against formwork

Spillway

SlopeType
 Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
85
Pozzolan (kg/m3)Pozzolan Type
85Low-lime flyash (ASTM Class F)