Xiaorongjiang
 Download PDF data sheet
Xiaorongjiang completed 

Particulars
Owner: unknown
Designer: Guangxi Design Institute of Water
Contractor: SinoHydro Construction Bureau Nº15 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 163 m3x106
Height: 90 metres
Length: 255 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/10 (— 2010)
Start of RCC: —/13 (— 2013)
End of RCC: —/16 (— 2016)
End of Project: —/17 (— 2017)