Xihe
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: Beijing Institute of Investigation, Design and Research for Hydropower
Contractor: 3rd Construction Bureau
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation
Reservoir capacity: 229 m3x106
Height: 63 metres
Length: 346 metres
Volume of RCC: 194 m3x103
Total volume: 631 m3x103
Construction Dates
Start of Project: 11/03 (November 2003)
Start of RCC: 02/04 (February 2004)
End of RCC: 05/05 (May 2005)
End of Project: 06/07 (June 2007)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| Low-lime flyash (ASTM Class F) | |
