Yangjiang PSP - Upper dam
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: 8th Construction Bureau
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 18 m3x106
Height: 101 metres
Length: 477 metres
Volume of RCC: unknown
Total volume: 652 m3x103
Construction Dates
Start of Project: 01/17 (January 2017)
Start of RCC: —/19 (— 2019)
End of RCC: 11/21 (November 2021)
End of Project: 06/22 (June 2022)
Country: China
River: Moyang
DMS Co-ordinates: 21˚52'53.24"N, 111˚22'57.91"E
DD Co-ordinates: 21.881454, 111.382751
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 6000 |