SEARCHING
... please wait

Yujianhe

Download PDF data sheet
Photo coming soon

Particulars

Owner: Guiyang Water Conservancy Bureau

Designer: Guizhou Investigation, Design and Research Institute

Contractor: 2nd (Guangdong) Construction Bureau

Statistics

Type: Thin Arch

Purpose(s): Flood Control / Irrigation / Water Supply

Reservoir capacity: 11 m3x106

Height: 81 metres

Length: 180 metres

Volume of RCC: 105 m3x103

Total volume: 110 m3x103

Construction Dates

Start of Project: —/02 (— 2002)

Start of RCC: —/03 (— 2003)

End of RCC: —/04 (— 2004)

End of Project: —/05 (— 2005)

Country: China

River: Wu

DMS Co-ordinates: unknown

DD Co-ordinates: unknown

Facings

Upstream

SlopeType
0.10 

Downstream

SlopeType
0.76 

Spillway

SlopeType
0.76 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type