SEARCHING
... please wait

Yujiankou

Download PDF data sheet
Yujiankou completed
Yujiankou completed

Particulars

Owner: unknown

Designer: Fuling Institute of Investigation and Design for Hydropower Projects

Contractor: 8th Construction Bureau

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 9 m3x106

Height: 50 metres

Length: 156 metres

Volume of RCC: 118 m3x103

Total volume: 147 m3x103

Construction Dates

Start of Project: 08/01 (August 2001)

Start of RCC: /03 ( 2003)

End of RCC: /04 ( 2004)

End of Project: /05 ( 2005)

Country: China

River: Longhe

DMS Co-ordinates: unknown

DD Co-ordinates: ,

Facings

Upstream

SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)

Downstream

SlopeType
0.70RCC against formwork (GEVR/GE-RCC)

Spillway

SlopeType
0.85Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
 Low-lime flyash (ASTM Class F)