Yushi
Download PDF data sheet
Yushi completed

Particulars
Owner: unknown
Designer: Liaoning Hydropower Investigation & Design Institute
Contractor: Liaoning Construction Bureau
Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 89 m3x106
Height: 50 metres
Length: 267 metres
Volume of RCC: 218 m3x103
Total volume: 233 m3x103
Construction Dates
Start of Project: —/98 (— 1998)
Start of RCC: —/99 (— 1999)
End of RCC: —/01 (— 2001)
End of Project: —/02 (— 2002)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| 70 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 70 | Low-lime flyash (ASTM Class F) |
