Yushi
Download PDF data sheet
Particulars
Owner: unknown
Designer: Liaoning Hydropower Investigation & Design Institute
Contractor: Liaoning Construction Bureau
Statistics
Type: Gravity
Purpose(s): Flood Control / Irrigation / Water Supply
Reservoir capacity: 89 m3x106
Height: 50 metres
Length: 267 metres
Volume of RCC: 218 m3x103
Total volume: 233 m3x103
Construction Dates
Start of Project: —/98 (— 1998)
Start of RCC: —/99 (— 1999)
End of RCC: —/01 (— 2001)
End of Project: —/02 (— 2002)
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
70 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
70 | Low-lime flyash (ASTM Class F) |