Yuwanghe
Download PDF data sheet
Photo coming soon

Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 11 m3x106
Height: 50 metres
Length: 157 metres
Volume of RCC: 106 m3x103
Total volume: unknown
Construction Dates
Start of Project: 09/16 (September 2016)
Start of RCC: —/19 (— 2019)
End of RCC: —/22 (— 2022)
End of Project: 11/23 (November 2023)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
