Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
Jin’anqiaoChinaH N RJinsha91312/0305/07- /10- /1116064024004430V(3)0.75(3)0.75(1)  72
96
108
117
(F)
A’haiChinaH IJinsha885- /08- /10- /11- /12138482 2707           
LongkaikouChinaF H N R WJinsha55808/0709/08- /12- /1311976828403853V(3)0.75(3)  300300096
60
96
90
(F)
GuanyinyanChinaF H N RJinsha2263- /0809/1105/14- /16159125064739364V
0.10
(3')0.75(3')0.75(1)300 5399(F)

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Navigation / Recreation

River: Jinsha

Reservoir capacity: 913 m3x106

Construction Dates

Start of Project: 12/03

Start of RCC: 12/03

End of RCC: -/10

End of Project: -/11

Specifications

Height: 160 metres

Length: 640 metres

Volume of RCC: 2400 m3x103

Total volume: 4430 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
72
96
Pozzolan (kg/m3)Pozzolan Type
108Low-lime flyash (ASTM Class F)
117 
Jin’anqiao completed
Jin’anqiao completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Hydropower / Irrigation

River: Jinsha

Reservoir capacity: 885 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: -/11

End of Project: -/12

Specifications

Height: 138 metres

Length: 482 metres

Volume of RCC: -

Total volume: 2707 m3x103

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
A’hai completed
A’hai completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply

River: Jinsha

Reservoir capacity: 558 m3x106

Construction Dates

Start of Project: 08/07

Start of RCC: 08/07

End of RCC: -/12

End of Project: -/13

Specifications

Height: 119 metres

Length: 768 metres

Volume of RCC: 2840 m3x103

Total volume: 3853 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork
Downstream
SlopeType
0.75RCC against formwork
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
96
60
Pozzolan (kg/m3)Pozzolan Type
96Low-lime flyash (ASTM Class F)
90 
Longkaikou completed
Longkaikou completed

Full Dam Information

Details

Country: China

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Navigation / Recreation

River: Jinsha

Reservoir capacity: 2263 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 05/14

End of Project: -/16

Specifications

Height: 159 metres

Length: 1250 metres

Volume of RCC: 6473 m3x103

Total volume: 9364 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
0.10 
Downstream
SlopeType
0.75RCC against formwork (GEVR/GE-RCC)
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300 

Cementitious material

Cement (kg/m3)
53
Pozzolan (kg/m3)Pozzolan Type
99Low-lime flyash (ASTM Class F)
  
Guanyinyan completed
Guanyinyan completed

 