Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Jin’anqiao | China | H N R | Jinsha | 913 | 12/03 | 05/07 | - /10 | - /11 | 160 | 640 | 2400 | 4430 | V | (3) | 0.75 | (3) | 0.75 | (1) | 72 96 | 108 117 | (F) | |||
A’hai | China | H I | Jinsha | 885 | - /08 | - /10 | - /11 | - /12 | 138 | 482 | 2707 | |||||||||||||
Longkaikou | China | F H N R W | Jinsha | 558 | 08/07 | 09/08 | - /12 | - /13 | 119 | 768 | 2840 | 3853 | V | (3) | 0.75 | (3) | 300 | 3000 | 96 60 | 96 90 | (F) | |||
Guanyinyan | China | F H N R | Jinsha | 2263 | - /08 | 09/11 | 05/14 | - /16 | 159 | 1250 | 6473 | 9364 | V 0.10 | (3') | 0.75 | (3') | 0.75 | (1) | 300 | 53 | 99 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 913 m3x106
Construction Dates
Start of Project: 12/03
Start of RCC: 12/03
End of RCC: -/10
End of Project: -/11
Specifications
Height: 160 metres
Length: 640 metres
Volume of RCC: 2400 m3x103
Total volume: 4430 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
96 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
108 | Low-lime flyash (ASTM Class F) |
117 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Hydropower / Irrigation
River: Jinsha
Reservoir capacity: 885 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: -/11
End of Project: -/12
Specifications
Height: 138 metres
Length: 482 metres
Volume of RCC: -
Total volume: 2707 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation / Water Supply
River: Jinsha
Reservoir capacity: 558 m3x106
Construction Dates
Start of Project: 08/07
Start of RCC: 08/07
End of RCC: -/12
End of Project: -/13
Specifications
Height: 119 metres
Length: 768 metres
Volume of RCC: 2840 m3x103
Total volume: 3853 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork |
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 3000 |
Cementitious material
Cement (kg/m3) |
---|
96 |
60 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
96 | Low-lime flyash (ASTM Class F) |
90 |
Details
Country: China
Owner: -
Type: Gravity
Purpose(s): Flood Control / Hydropower / Navigation / Recreation
River: Jinsha
Reservoir capacity: 2263 m3x106
Construction Dates
Start of Project: -/08
Start of RCC: -/08
End of RCC: 05/14
End of Project: -/16
Specifications
Height: 159 metres
Length: 1250 metres
Volume of RCC: 6473 m3x103
Total volume: 9364 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
0.10 |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) |
Spillway
Slope | Type |
---|---|
0.75 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 |
Cementitious material
Cement (kg/m3) |
---|
53 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
99 | Low-lime flyash (ASTM Class F) |