Dam Search Results
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
← Scroll the table horizontally to view its entire width →
Name | Country | Owner | Purpose | River | Reservoir capacity (m3x106) | Construction dates | Dimensions | Volume | Facings | Placement | Cementitious material | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Start | Finish | Height | Length | RCC | Total | Upstream | Downstream | Spillway | Layers | Lifts | Cement | Pozzolan | ||||||||||||
Project | RCC | RCC | Project | (m) | (m) | (m3x103) | (m3x103) | Slope | Type | Slope | Type | Slope | Type | (m) | (m) | (kg/m3) | (kg/m3) | |||||||
Ghatghar (Upper dam) | India | H | Pravara | 6 | 12/01 | 05/03 | 01/04 | 06/04 | 15 | 503 | 35 | 40 | V | (3') | 0.78 | (3')* | 0.78 | (3')* | 300 | 300 | 88 | 132 | (F) | |
Ghatghar (Lower dam) | India | H | Shahi Nallah | 3 | 12/01 | 12/04 | 05/06 | 03/07 | 86 | 447 | 638 | 646 | 0.141 | (3') | 0.782 | (3')* | 0.782 | (3')* | 300 | 300 | 75 | 150 | (F) | |
Middle Vaitarna | India | W | Vaitarna | 202 | 10/08 | 05/10 | 04/12 | - /12 | 102 | 565 | 1202 | 1500 | 0.15 | (3') | 0.75 | (3')* | 0.75 | (12) | 300 | 300 | 75 | 145 | (F) | |
Teesta low dam (Stage IV) | India | H | Teesta | 37 | 05/06 | 01/13 | 05/15 | 08/16 | 45 | 196 | 167 | 170 | 0.40 | (3')* | 0.80 | (3')* | separate | 300 | 300 | 85 | 135 | (F) |
← Scroll the table horizontally to view its entire width →
Search again
Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.
Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.
Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Pravara
Reservoir capacity: 6 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 01/04
End of Project: 06/04
Specifications
Height: 15 metres
Length: 503 metres
Volume of RCC: 35 m3x103
Total volume: 40 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
Vertical | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.78 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
88 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
132 | Low-lime flyash (ASTM Class F) |
Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Shahi Nallah
Reservoir capacity: 3 m3x106
Construction Dates
Start of Project: 12/01
Start of RCC: 12/01
End of RCC: 05/06
End of Project: 03/07
Specifications
Height: 86 metres
Length: 447 metres
Volume of RCC: 638 m3x103
Total volume: 646 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.141 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.782 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.782 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
150 | Low-lime flyash (ASTM Class F) |
Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Water Supply
River: Vaitarna
Reservoir capacity: 202 m3x106
Construction Dates
Start of Project: 10/08
Start of RCC: 10/08
End of RCC: 04/12
End of Project: -/12
Specifications
Height: 102 metres
Length: 565 metres
Volume of RCC: 1202 m3x103
Total volume: 1500 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.15 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
0.75 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
0.75 | Reinforced conventional concrete cast after RCC placement |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
75 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
145 | Low-lime flyash (ASTM Class F) |
Details
Country: India
Owner: -
Type: Gravity
Purpose(s): Hydropower
River: Teesta
Reservoir capacity: 37 m3x106
Construction Dates
Start of Project: 05/06
Start of RCC: 05/06
End of RCC: 05/15
End of Project: 08/16
Specifications
Height: 45 metres
Length: 196 metres
Volume of RCC: 167 m3x103
Total volume: 170 m3x103
Construction Methods
Facings
Upstream
Slope | Type |
---|---|
0.40 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Downstream
Slope | Type |
---|---|
0.80 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
separate |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
85 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
135 | Low-lime flyash (ASTM Class F) |
Search again
Please note: only dams with known co-ordinates will appear on this map.
Your search returned no dams with known co-ordinates