Dam Search Results

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the table below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

← Scroll the table horizontally to view its entire width →

NameCountryOwnerPurposeRiverReservoir capacity (m3x106)Construction datesDimensionsVolumeFacingsPlacementCementitious material
StartFinishHeightLengthRCCTotalUpstreamDownstreamSpillwayLayersLiftsCementPozzolan
ProjectRCCRCCProject(m)(m)(m3x103)(m3x103)SlopeTypeSlopeTypeSlopeType(m)(m)(kg/m3)(kg/m3)
La ManzanillaMexicoFIbarrilla111/8601/8705/8707/87361502030V
0.15
(5)
(5)
V
0.80
(5)
(17)
0.80(12)300300135135(F)
TrigomilMexicoF IAyuguila32412/8602/9112/9212/93107250362681V
0.24
(5)V
0.80
(5)
(17)
0.80(1)30030014847(F)
VinoramasMexicoF IEl Bledal10210/9104/9312/9301/9450807117184V(5)0.80(3)*0.80(13)300300100100(M)
San LazaroMexicoF G WSan Lazaro1110/8504/9406/9407/94371763553V
0.20
(5)0.80(3)*0.80(13)300300100
90
220
220
(M)
San RafaelMexicoF HSantiago2611/9305/9407/9407/944817681110V(5)0.66
0.80
(3)*separate 30030090130(N)
Las BlancasMexicoIÁlomo & Soso12408/9803/9912/9911/00322795221316V(8)V
0.75
(7)
(3)
0.75(1)300300100100(F)
Rompepicos en Corral des PalmasMexicoFSanta Catarina100- /0203/03- /03- /04109250380400V(8)V
0.85
(5)
(17)
0.85(12)3003006535(F)
AmataMexicoISan Lorenzo1411/0311/0404/0506/05302184260V
1.00
(8)1.00(3)*1.00(12)3003001200(-) -
El SauzMexicoW  - /04- /05- /06- /0730              
PicachosMexicoI WPresidio32202/0709/07- /08- /098525685 V
0.15
(12)
(12)
0.85(12)0.85(12)30030005045(S)
Las TruchasMexicoHLa Lobor o Las Truchas - /07- /08- /08- /093523024       300300   
Francisco J. Múgica (formerly Nueva Italia)MexicoIEl Marqués10003/08- /09- /10- /1190375367451V
0.30
 1.00 1.00 300300650(-) -
El RealitoMexicoSanta Maria57- /0807/0906/11- /1185270420 V(1)0.85 0.85 30030033 to  6627 to  54(S)
Los PanalesMexicoWTecolotán10001/11- /12- /13- /13784404965610.20
V
(5)0.80(3)0.80(3)3003001100(N)
El PurgatorioMexicoFVerde3506/13- /14- /15- /1638200400 0.25 1.00 1.00      
Bicentennial/Los PilaresMexicoF I WMayo47802/14- /16- /1908/2073232600       300300   
Las CrucesMexicoF H I RSan Pedro Mazquital2485- /17- /18- /20- /2118581522400V
0.10
(1)
(1)
0.80(1)0.80 300300   
El ZapotilloMexicoWVerde910- /0911/11- /21- /2213227111001200V(3')0.83(3)*0.83(3)*30030060 to  8050 to  70(S)
San JulianMexicoWFuerte - /16- /19- /21- /2244240             
La LibertadMexicoWSan Fernando221- /20- /21- /23- /2447              

← Scroll the table horizontally to view its entire width →

 

Search again

Please note: only dams ≥ 15m which have been completed, are under construction, or due to begin RCC placement in the current year are included in the list below.

Results are sorted in the following order: Finish of RCC, Start of RCC, Finish of Project, Start of Project, Height and alphabetical by Dam Name.

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Ibarrilla

Reservoir capacity: 1 m3x106

Construction Dates

Start of Project: 11/86

Start of RCC: 11/86

End of RCC: 05/87

End of Project: 07/87

Specifications

Height: 36 metres

Length: 150 metres

Volume of RCC: 20 m3x103

Total volume: 30 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.15Traditional concrete against precast concrete panels
Downstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.80Unformed face of RCC
Spillway
SlopeType
0.80Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
135
Pozzolan (kg/m3)Pozzolan Type
135Low-lime flyash (ASTM Class F)
  
La Manzanilla completed
La Manzanilla completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation

River: Ayuguila

Reservoir capacity: 324 m3x106

Construction Dates

Start of Project: 12/86

Start of RCC: 12/86

End of RCC: 12/92

End of Project: 12/93

Specifications

Height: 107 metres

Length: 250 metres

Volume of RCC: 362 m3x103

Total volume: 681 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.24 
Downstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.80Unformed face of RCC
Spillway
SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
148
Pozzolan (kg/m3)Pozzolan Type
47Low-lime flyash (ASTM Class F)
  
Trigomil completed
Trigomil completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation

River: El Bledal

Reservoir capacity: 102 m3x106

Construction Dates

Start of Project: 10/91

Start of RCC: 10/91

End of RCC: 12/93

End of Project: 01/94

Specifications

Height: 50 metres

Length: 807 metres

Volume of RCC: 117 m3x103

Total volume: 184 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Milled sand
  
Vinoramas completed
Vinoramas completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control / Groundwater Recharge / Water Supply

River: San Lazaro

Reservoir capacity: 11 m3x106

Construction Dates

Start of Project: 10/85

Start of RCC: 10/85

End of RCC: 06/94

End of Project: 07/94

Specifications

Height: 37 metres

Length: 176 metres

Volume of RCC: 35 m3x103

Total volume: 53 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.20 
Downstream
SlopeType
0.80RCC against formwork  [stepped face]
Spillway
SlopeType
0.80Reinforced concrete cast against precast units or slip-formed facing elements

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
90
Pozzolan (kg/m3)Pozzolan Type
220Milled sand
220 
San Lazaro completed
San Lazaro completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower

River: Santiago

Reservoir capacity: 26 m3x106

Construction Dates

Start of Project: 11/93

Start of RCC: 11/93

End of RCC: 07/94

End of Project: 07/94

Specifications

Height: 48 metres

Length: 176 metres

Volume of RCC: 81 m3x103

Total volume: 110 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against precast concrete panels
Downstream
SlopeType
0.66RCC against formwork  [stepped face]
0.80 
Spillway
SlopeType
separate 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
90
Pozzolan (kg/m3)Pozzolan Type
130Natural pozzolan (ASTM Class N)
  
San Rafael completed
San Rafael completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: Álomo & Soso

Reservoir capacity: 124 m3x106

Construction Dates

Start of Project: 08/98

Start of RCC: 08/98

End of RCC: 12/99

End of Project: 11/00

Specifications

Height: 32 metres

Length: 2795 metres

Volume of RCC: 221 m3x103

Total volume: 316 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with geomembrane
Downstream
SlopeType
VerticalRCC against precast concrete panels
0.75RCC against formwork
Spillway
SlopeType
0.75Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
100
Pozzolan (kg/m3)Pozzolan Type
100Low-lime flyash (ASTM Class F)
  
Las Blancas completed
Las Blancas completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Santa Catarina

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: -/02

Start of RCC: -/02

End of RCC: -/03

End of Project: -/04

Specifications

Height: 109 metres

Length: 250 metres

Volume of RCC: 380 m3x103

Total volume: 400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with geomembrane
Downstream
SlopeType
VerticalTraditional concrete against precast concrete panels
0.85Unformed face of RCC
Spillway
SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
35Low-lime flyash (ASTM Class F)
  
Rompepicos en Corral des Palmas completed
Rompepicos en Corral des Palmas completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: San Lorenzo

Reservoir capacity: 14 m3x106

Construction Dates

Start of Project: 11/03

Start of RCC: 11/03

End of RCC: 04/05

End of Project: 06/05

Specifications

Height: 30 metres

Length: 218 metres

Volume of RCC: 42 m3x103

Total volume: 60 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against precast concrete panels with geomembrane
1.00 
Downstream
SlopeType
1.00RCC against formwork  [stepped face]
Spillway
SlopeType
1.00Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
120
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Amata completed
Amata completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: -

Reservoir capacity: -

Construction Dates

Start of Project: -/04

Start of RCC: -/04

End of RCC: -/06

End of Project: -/07

Specifications

Height: 30 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Irrigation / Water Supply

River: Presidio

Reservoir capacity: 322 m3x106

Construction Dates

Start of Project: 02/07

Start of RCC: 02/07

End of RCC: -/08

End of Project: -/09

Specifications

Height: 85 metres

Length: 256 metres

Volume of RCC: 85 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalReinforced conventional concrete cast after RCC placement
0.15Reinforced conventional concrete cast after RCC placement
Downstream
SlopeType
0.85Reinforced conventional concrete cast after RCC placement
Spillway
SlopeType
0.85Reinforced conventional concrete cast after RCC placement

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
50
Pozzolan (kg/m3)Pozzolan Type
45Ground-granulated blast-furnace slag
  
Picachos completed
Picachos completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Hydropower

River: La Lobor o Las Truchas

Reservoir capacity: -

Construction Dates

Start of Project: -/07

Start of RCC: -/07

End of RCC: -/08

End of Project: -/09

Specifications

Height: 35 metres

Length: 230 metres

Volume of RCC: 24 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Las Truchas completed
Las Truchas completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Irrigation

River: El Marqués

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: 03/08

Start of RCC: 03/08

End of RCC: -/10

End of Project: -/11

Specifications

Height: 90 metres

Length: 375 metres

Volume of RCC: 367 m3x103

Total volume: 451 m3x103

Construction Methods

Facings

Upstream
SlopeType
Vertical 
0.30 
Downstream
SlopeType
1.00 
Spillway
SlopeType
1.00 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
65
Pozzolan (kg/m3)Pozzolan Type
0No pozzolan used  -
  
Francisco J. Múgica (formerly Nueva Italia) completed
Francisco J. Múgica (formerly Nueva Italia) completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): unknown

River: Santa Maria

Reservoir capacity: 57 m3x106

Construction Dates

Start of Project: -/08

Start of RCC: -/08

End of RCC: 06/11

End of Project: -/11

Specifications

Height: 85 metres

Length: 270 metres

Volume of RCC: 420 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
Downstream
SlopeType
0.85 
Spillway
SlopeType
0.85 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
33  to
Pozzolan (kg/m3)Pozzolan Type
27  toGround-granulated blast-furnace slag
  
El Realito completed
El Realito completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Tecolotán

Reservoir capacity: 100 m3x106

Construction Dates

Start of Project: 01/11

Start of RCC: 01/11

End of RCC: -/13

End of Project: -/13

Specifications

Height: 78 metres

Length: 440 metres

Volume of RCC: 496 m3x103

Total volume: 561 m3x103

Construction Methods

Facings

Upstream
SlopeType
0.20Traditional concrete against precast concrete panels
Vertical 
Downstream
SlopeType
0.80RCC against formwork
Spillway
SlopeType
0.80RCC against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
110
Pozzolan (kg/m3)Pozzolan Type
0Natural pozzolan (ASTM Class N)
  
Los Panales under construction
Los Panales under construction

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control

River: Verde

Reservoir capacity: 35 m3x106

Construction Dates

Start of Project: 06/13

Start of RCC: 06/13

End of RCC: -/15

End of Project: -/16

Specifications

Height: 38 metres

Length: 200 metres

Volume of RCC: 400 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
0.25 
Downstream
SlopeType
1.00 
Spillway
SlopeType
1.00 

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
El Purgatorio under construction
El Purgatorio under construction

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control / Irrigation / Water Supply

River: Mayo

Reservoir capacity: 478 m3x106

Construction Dates

Start of Project: 02/14

Start of RCC: 02/14

End of RCC: -/19

End of Project: 08/20

Specifications

Height: 73 metres

Length: 232 metres

Volume of RCC: 600 m3x103

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Bicentennial/Los Pilares completed
Bicentennial/Los Pilares completed

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Recreation

River: San Pedro Mazquital

Reservoir capacity: 2485 m3x106

Construction Dates

Start of Project: -/17

Start of RCC: -/17

End of RCC: -/20

End of Project: -/21

Specifications

Height: 185 metres

Length: 815 metres

Volume of RCC: 2 m3x103

Total volume: 2400 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalTraditional concrete against formwork
0.10Traditional concrete against formwork
Downstream
SlopeType
0.80Traditional concrete against formwork
Spillway
SlopeType
0.80 

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
Photo coming soon

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Verde

Reservoir capacity: 910 m3x106

Construction Dates

Start of Project: -/09

Start of RCC: -/09

End of RCC: -/21

End of Project: -/22

Specifications

Height: 132 metres

Length: 271 metres

Volume of RCC: 1100 m3x103

Total volume: 1200 m3x103

Construction Methods

Facings

Upstream
SlopeType
VerticalRCC against formwork (GEVR/GE-RCC)
Downstream
SlopeType
0.83RCC against formwork  [stepped face]
Spillway
SlopeType
0.83RCC against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
60  to
Pozzolan (kg/m3)Pozzolan Type
50  toGround-granulated blast-furnace slag
  
El Zapotillo under construction
El Zapotillo under construction

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: Fuerte

Reservoir capacity: -

Construction Dates

Start of Project: -/16

Start of RCC: -/16

End of RCC: -/21

End of Project: -/22

Specifications

Height: 44 metres

Length: 240 metres

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
San Julian under construction
San Julian under construction

Full Dam Information

Details

Country: Mexico

Owner: -

Type: Gravity

Purpose(s): Water Supply

River: San Fernando

Reservoir capacity: 221 m3x106

Construction Dates

Start of Project: -/20

Start of RCC: -/20

End of RCC: -/23

End of Project: -/24

Specifications

Height: 47 metres

Length: -

Volume of RCC: -

Total volume: -

Construction Methods

Facings

Upstream
SlopeType
  
Downstream
SlopeType
  
Spillway
SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type
  
  
La Libertad on Google Earth
La Libertad on Google Earth

 

Search again

Please note: only dams with known co-ordinates will appear on this map.

Your search returned no dams with known co-ordinates