Abou Al Abbas Sebti (formerly Taskourt)
 Download PDF data sheet
Abou Al Abbas Sebti (formerly Taskourt) completed 

Particulars
Owner: unknown
Designer: CID
Contractor: Houar
Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 25 m3x106
Height: 75 metres
Length: 408 metres
Volume of RCC: 415 m3x103
Total volume: 490 m3x103
Construction Dates
Start of Project: 01/08 (January 2008)
Start of RCC: 04/09 (April 2009)
End of RCC: 09/10 (September 2010)
End of Project: 04/11 (April 2011)
Country: Morocco
River: Al Mal
DMS Co-ordinates: 31˚10'47.12"N, 8˚28'37.16"W
DD Co-ordinates: 31.179756, -8.476989
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against precast concrete panels | 
Downstream
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] | 
Spillway
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] | 
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 73 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 32 | Natural pozzolan (ASTM Class N) | 

 
 