Água Limpa
Download PDF data sheet
Água Limpa completed

Particulars
Owner: unknown
Designer: MEK Engenharia e Consultoria Ltda
Contractor: Água Limpa Energia S.A.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 10 m3x106
Height: 38 metres
Length: 65 metres
Volume of RCC: 42 m3x103
Total volume: unknown
Construction Dates
Start of Project: —/11 (— 2011)
Start of RCC: —/11 (— 2011)
End of RCC: —/12 (— 2012)
End of Project: —/12 (— 2012)
Country: Brazil
River: Palmeiras
DMS Co-ordinates: 11˚44'26.87"S, 46˚45'11.83"W
DD Co-ordinates: -11.740797, -46.753284
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
