Baise

Download PDF data sheet
Baise completed
Baise completed

Particulars

Owner: unknown

Designer: Institute of Design and Investigation, Water Resources and Hydroelectric Power, Guangxi

Contractor: Construction Bureaux Minjiang and Huanghe J.V. (now SinoHydro)

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower / Irrigation / Navigation / Water Supply

Reservoir capacity: 5660 m3x106

Height: 130 metres

Length: 720 metres

Volume of RCC: 1995 m3x103

Total volume: 2672 m3x103

Construction Dates

Start of Project: 12/01 (December 2001)

Start of RCC: 12/02 (December 2002)

End of RCC: 04/06 (April 2006)

End of Project: 07/06 (July 2006)

Country: China

River: Youjiang

DMS Co-ordinates: 23˚55'35.46"N, 106˚27'21.25"E

DD Co-ordinates: 23.926517, 106.455902

Facings

Upstream

SlopeType
VerticalRCC against precast concrete panels with hot poured membrane

Downstream

SlopeType
0.80Traditional concrete against formwork

Spillway

SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
3003000

Cementitious material

Cement (kg/m3)
80
50
Pozzolan (kg/m3)Pozzolan Type
132Low-lime flyash (ASTM Class F)
110