Bandeira de Melo
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Irrigation / Water Supply
Reservoir capacity: 112 m3x106
Height: 19 metres
Length: 320 metres
Volume of RCC: 75 m3x103
Total volume: 85 m3x103
Construction Dates
Start of Project: —/02 (— 2002)
Start of RCC: 09/03 (September 2003)
End of RCC: —/04 (— 2004)
End of Project: —/05 (— 2005)
Country: Brazil
River: Paraguaçu
DMS Co-ordinates: 13˚1'45.5"S, 40˚48'56.0"W
DD Co-ordinates: -13.029306, -40.815556
Facings
Upstream
Slope | Type |
---|---|
Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Spillway
Slope | Type |
---|---|
Traditional concrete against formwork [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
56 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
14 | Natural pozzolan (ASTM Class N) |