Barra do Rio Chapéu
Download PDF data sheet
Barra do Rio Chapéu under construction

Particulars
Owner: unknown
Designer: unknown
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower / Water Supply
Reservoir capacity: 21 m3x106
Height: 21 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/12 (— 2012)
Start of RCC: —/12 (— 2012)
End of RCC: —/13 (— 2013)
End of Project: —/13 (— 2013)
Country: Brazil
River: Braço do Norte
DMS Co-ordinates: 28˚04'53.20"S, 49˚08'55.9"W
DD Co-ordinates: -28.081444, -49.148861
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
