Burguillos del Cerro
Download PDF data sheet
Burguillos del Cerro completed

Particulars
Owner: unknown
Designer: Euroestudios S.A.
Contractor: Padros (OCP Construcciones) - now ACS Dragados
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 3 m3x106
Height: 24 metres
Length: 167 metres
Volume of RCC: 25 m3x103
Total volume: 33 m3x103
Construction Dates
Start of Project: 12/90 (December 1990)
Start of RCC: 05/91 (May 1991)
End of RCC: 09/91 (September 1991)
End of Project: 12/91 (December 1991)
Country: Spain
River: Ribera de los Montes
DMS Co-ordinates: 38˚24'0.6"N, 6˚36'12.95"W
DD Co-ordinates: 38.400166, -6.603597
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Slip-formed/extruded facing elements |
Downstream
| Slope | Type |
|---|---|
| 0.13 | Slip-formed/extruded facing elements [stepped face] |
| 0.60 |
Spillway
| Slope | Type |
|---|---|
| 0.60 | Reinforced concrete cast against precast units or slip-formed facing elements [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 80 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 135 | Low-lime flyash (ASTM Class F) |
