Caju
Download PDF data sheet
Particulars
Owner: unknown
Designer: Hacker Industrial Ltda.
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 10 m3x106
Height: 38 metres
Length: 220 metres
Volume of RCC: 66 m3x103
Total volume: 82 m3x103
Construction Dates
Start of Project: —/09 (— 2009)
Start of RCC: —/09 (— 2009)
End of RCC: —/10 (— 2010)
End of Project: 03/11 (March 2011)
Country: Brazil
River: Rio Grande
DMS Co-ordinates: 21˚56'14.01"S, 42 ˚05'23.94"W
DD Co-ordinates: -21.937225, -42.089985
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|