Camará
 Download PDF data sheet
Camará completed 

Particulars
Owner: unknown
Designer: Holanda Engenharia Ltda.
Contractor: CRE-Andrade Galvão
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 27 m3x106
Height: 56 metres
Length: 296 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 05/00 (May 2000)
Start of RCC: 09/01 (September 2001)
End of RCC: 06/02 (June 2002)
End of Project: —/02 (— 2002)
Country: Brazil
River: Riachäo
DMS Co-ordinates: 7˚01'56.46"S, 35˚45'42.81"W
DD Co-ordinates: -7.03235, -35.76189
Facings
Upstream
| Slope | Type | 
|---|---|
| Vertical | Traditional concrete against formwork | 
Downstream
| Slope | Type | 
|---|---|
| 0.80 | Traditional concrete against formwork | 
Spillway
| Slope | Type | 
|---|---|
Placement
| Layers (mm) | Lifts (mm) | 
|---|---|
| 300 | 300 | 
Cementitious material
| Cement (kg/m3) | 
|---|
| 80 | 
| Pozzolan (kg/m3) | Pozzolan Type | 
|---|---|
| 0 | No pozzolan used - | 

 
 