SEARCHING
... please wait

Canoas

Download PDF data sheet
Canoas completed
Canoas completed

Particulars

Owner: unknown

Designer: Mecil-Engenharia, Projetos e Construções Ltda

Contractor: Getel Ltda & Oliveira Maciel Ltda

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: 69 m3x106

Height: 51 metres

Length: 116 metres

Volume of RCC: 87 m3x103

Total volume: 93 m3x103

Construction Dates

Start of Project: 07/93 (July 1993)

Start of RCC: 08/94 (August 1994)

End of RCC: 05/95 (May 1995)

End of Project: /96 ( 1996)

Country: Brazil

River: Saõ Gonçalo

DMS Co-ordinates: 6˚56'47.96"S, 39˚56'28.65"W

DD Co-ordinates: -6.946656, -39.941292

Facings

Upstream

SlopeType
0.10Traditional concrete against formwork

Downstream

SlopeType
0.80RCC against precast concrete blocks  [stepped face]

Spillway

SlopeType
0.80Traditional concrete against formwork  [stepped face]

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
64
Pozzolan (kg/m3)Pozzolan Type
16Natural pozzolan (ASTM Class N)