SEARCHING
... please wait

Christian E. Siegrist

Download PDF data sheet
Christian E. Siegrist completed
Christian E. Siegrist completed

Particulars

Owner: unknown

Designer: Gannett-Fleming

Contractor: unknown

Statistics

Type: Gravity

Purpose(s): Water Supply

Reservoir capacity: 4 m3x106

Height: 40 metres

Length: 213 metres

Volume of RCC: 69 m3x103

Total volume: 70 m3x103

Construction Dates

Start of Project: 09/91 (September 1991)

Start of RCC: 04/92 (April 1992)

End of RCC: 07/92 (July 1992)

End of Project: /93 ( 1993)

Country: USA

River: Mill

DMS Co-ordinates: 40˚32'38.28"N, 76˚29'46.97"W

DD Co-ordinates: 40.543968, -76.496384

Facings

Upstream

SlopeType
VerticalTraditional concrete against precast concrete panels with geomembrane

Downstream

SlopeType
0.80Unformed face of RCC

Spillway

SlopeType
0.80Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
300300

Cementitious material

Cement (kg/m3)
59
Pozzolan (kg/m3)Pozzolan Type
34Low-lime flyash (ASTM Class F)