Christian E. Siegrist
Download PDF data sheet
Christian E. Siegrist completed

Particulars
Owner: unknown
Designer: Gannett-Fleming
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 4 m3x106
Height: 40 metres
Length: 213 metres
Volume of RCC: 69 m3x103
Total volume: 70 m3x103
Construction Dates
Start of Project: 09/91 (September 1991)
Start of RCC: 04/92 (April 1992)
End of RCC: 07/92 (July 1992)
End of Project: —/93 (— 1993)
Country: USA
River: Mill
DMS Co-ordinates: 40˚32'38.28"N, 76˚29'46.97"W
DD Co-ordinates: 40.543968, -76.496384
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Unformed face of RCC |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 59 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 34 | Low-lime flyash (ASTM Class F) |
