Particulars
Owner: DSI - State Hydraulic Works
Designer: DSI - State Hydraulic Works
Contractor: Ozaltin Ins. Tic. ve San A.S.
Statistics
Type: Hardfill
Purpose(s): Hydropower / Irrigation / Water Supply
Reservoir capacity: 82 m3x106
Height: 107 metres
Length: 280 metres
Volume of RCC: 1500 m3x103
Total volume: 1685 m3x103
Construction Dates
Start of Project: 04/94 (April 1994)
Start of RCC: 07/02 (July 2002)
End of RCC: 05/05 (May 2005)
End of Project: 11/07 (November 2007)
Country: Turkey
River: Buyuk Menderes
DMS Co-ordinates: 38˚6'56"N, 29˚2'6"E
DD Co-ordinates: 38.115555, 29.035
Facings
Upstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against precast concrete panels with geomembrane |
Downstream
| Slope | Type |
|---|---|
| 0.70 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.89 | Reinforced conventional concrete cast after RCC placement |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 50 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 20 | Low-lime flyash (ASTM Class F) |