Cisokan PSS (Lower dam)
Download PDF data sheet
Particulars
Owner: unknown
Designer: Prima Layanan Nasional Enjiniring (PLNE)
Contractor: JV of Daelim (Korea), Astaldi (Italy) and Wika (Indonesia)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 10 m3x106
Height: 75 metres
Length: 294 metres
Volume of RCC: 529 m3x103
Total volume: 566 m3x103
Construction Dates
Start of Project: —/20 (— 2020)
Start of RCC: 05/22 (May 2022)
End of RCC: 06/23 (June 2023)
End of Project: 08/24 (August 2024)
Country: Indonesia
River: Cisokan
DMS Co-ordinates: 6˚56'44.41"S, 107˚13'2.38"E
DD Co-ordinates: -6.94567, 107.217331
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
300 | 300 |
Cementitious material
Cement (kg/m3) |
---|
40 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
60 | |