do Peixe
Download PDF data sheet
do Peixe completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 2 m3x106
Height: 32 metres
Length: 300 metres
Volume of RCC: 20 m3x103
Total volume: 34 m3x103
Construction Dates
Start of Project: 02/96 (February 1996)
Start of RCC: 12/96 (December 1996)
End of RCC: 12/97 (December 1997)
End of Project: —/98 (— 1998)
Country: Brazil
River: do Peixe
DMS Co-ordinates: 21˚37'38.88"S, 46˚47'25.15"W
DD Co-ordinates: -21.627466, -46.790318
Facings
Upstream
| Slope | Type |
|---|---|
| Vertical | Traditional concrete against formwork |
Downstream
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Spillway
| Slope | Type |
|---|---|
| 0.80 | Traditional concrete against formwork [stepped face] |
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
| 300 | 300 |
Cementitious material
| Cement (kg/m3) |
|---|
| 120 |
| 90 |
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
| 0 | No pozzolan used |
| 0 |