Dong Mit
Download PDF data sheet
Photo coming soon

Particulars
Owner: unknown
Designer: PECC1 (Power Engineering Consulting Company Nº1)
Contractor: Construction Joint Stock Company 47
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 90 m3x106
Height: 68 metres
Length: 378 metres
Volume of RCC: 353 m3x103
Total volume: 456 m3x103
Construction Dates
Start of Project: 02/19 (February 2019)
Start of RCC: 07/19 (July 2019)
End of RCC: 08/21 (August 2021)
End of Project: 06/22 (June 2022)
Country: Vietnam
River: Song An Lao
DMS Co-ordinates: 14˚39'30.36"N, 108˚50'24.16"E
DD Co-ordinates: 14.658433, 108.840042
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
