SEARCHING
... please wait

Dong Mit

< Back to search results

Download PDF data sheet
Photo coming soon

Particulars

Owner: unknown

Designer: PECC1 (Power Engineering Consulting Company Nº1)

Contractor: Construction Joint Stock Company 47

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 90 m3x106

Height: 68 metres

Length: 378 metres

Volume of RCC: 353 m3x103

Total volume: 456 m3x103

Construction Dates

Start of Project: 02/19 (February 2019)

Start of RCC: 07/19 (July 2019)

End of RCC: 08/21 (August 2021)

End of Project: 06/22 (June 2022)

Country: Vietnam

River: Song An Lao

DMS Co-ordinates: 14˚39'30.36"N, 108˚50'24.16"E

DD Co-ordinates: 14.658433, 108.840042

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type