Dr Victor Baptista Adami (formerly Passos Maia)
Download PDF data sheet
Particulars
Owner: unknown
Designer: Engevix Engenharia S.A.
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 14 m3x106
Height: 34 metres
Length: unknown
Volume of RCC: 66 m3x103
Total volume: unknown
Construction Dates
Start of Project: —/09 (— 2009)
Start of RCC: —/10 (— 2010)
End of RCC: —/11 (— 2011)
End of Project: 09/12 (September 2012)
Country: Brazil
River: Chapecó
DMS Co-ordinates: 26˚42'14.23"S, 51˚55'5.35"W
DD Co-ordinates: -26.703953, -51.918156
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
72 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
18 | Natural pozzolan (ASTM Class N) |