Figueirópolis
Download PDF data sheet
Particulars
Owner: unknown
Designer: ENGECON Engenharia
Contractor: unknown
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 35 m3x106
Height: 16 metres
Length: 170 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/08 (— 2008)
Start of RCC: —/09 (— 2009)
End of RCC: —/10 (— 2010)
End of Project: 12/10 (December 2010)
Country: Brazil
River: Jauru
DMS Co-ordinates: 15˚23'34.82"S, 58˚38'17.78"W
DD Co-ordinates: -15.393006, -58.638271
Facings
Upstream
Slope | Type |
---|---|
Vertical |
Downstream
Slope | Type |
---|---|
0.43 |
Spillway
Slope | Type |
---|---|
0.75 |
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|