Fukuchiyama
Download PDF data sheet
Particulars
Owner: unknown
Designer: Fukuoka-ken
Contractor: Taisei Construction Co., Ltd., Maeda Construction Kogyo Co., Ltd. and Tamehiro Co., Ltd. J.V.
Statistics
Type: Gravity
Purpose(s): Flood Control / Navigation / Water Supply
Reservoir capacity: 3 m3x106
Height: 65 metres
Length: 255 metres
Volume of RCC: 115 m3x103
Total volume: 201 m3x103
Construction Dates
Start of Project: 10/98 (October 1998)
Start of RCC: —/99 (— 1999)
End of RCC: 12/01 (December 2001)
End of Project: 03/03 (March 2003)
Country: Japan
River: Fukuti
DMS Co-ordinates: 33˚45'24.33"N, 130˚47'0.42"E
DD Co-ordinates: 33.75676, 130.783447
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.78 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
250 | 750 |
Cementitious material
Cement (kg/m3) |
---|
84 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
36 | Low-lime flyash (ASTM Class F) |