Fukuchiyama

Download PDF data sheet
Fukuchiyama completed
Fukuchiyama completed

Particulars

Owner: unknown

Designer: Fukuoka-ken

Contractor: Taisei Construction Co., Ltd., Maeda Construction Kogyo Co., Ltd. and Tamehiro Co., Ltd. J.V.

Statistics

Type: Gravity

Purpose(s): Flood Control / Navigation / Water Supply

Reservoir capacity: 3 m3x106

Height: 65 metres

Length: 255 metres

Volume of RCC: 115 m3x103

Total volume: 201 m3x103

Construction Dates

Start of Project: 10/98 (October 1998)

Start of RCC: /99 ( 1999)

End of RCC: 12/01 (December 2001)

End of Project: 03/03 (March 2003)

Country: Japan

River: Fukuti

DMS Co-ordinates: 33˚45'24.33"N, 130˚47'0.42"E

DD Co-ordinates: 33.75676, 130.783447

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork

Downstream

SlopeType
0.78Traditional concrete against formwork

Spillway

SlopeType
0.78Traditional concrete against formwork

Placement

Layers (mm)Lifts (mm)
250750

Cementitious material

Cement (kg/m3)
84
Pozzolan (kg/m3)Pozzolan Type
36Low-lime flyash (ASTM Class F)