SEARCHING
... please wait

Fuzikou

Download PDF data sheet
Fuzikou under construction
Fuzikou under construction

Particulars

Owner: unknown

Designer: unknown

Contractor: SinoHydro Construction Bureau Nº8 Co. Ltd.

Statistics

Type: Gravity

Purpose(s): Flood Control / Hydropower

Reservoir capacity: 188 m3x106

Height: 77 metres

Length: 239 metres

Volume of RCC: unknown

Total volume: 304 m3x103

Construction Dates

Start of Project: 11/11 (November 2011)

Start of RCC: /12 ( 2012)

End of RCC: /13 ( 2013)

End of Project: /14 ( 2014)

Country: China

River: Lijiang

DMS Co-ordinates: 25˚40'40.9"N, 110˚28'43.21"E

DD Co-ordinates: 25.678028, 110.478668

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type