Fuzikou
Download PDF data sheet
Particulars
Owner: unknown
Designer: unknown
Contractor: SinoHydro Construction Bureau Nº8 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower
Reservoir capacity: 188 m3x106
Height: 77 metres
Length: 239 metres
Volume of RCC: unknown
Total volume: 304 m3x103
Construction Dates
Start of Project: 11/11 (November 2011)
Start of RCC: —/12 (— 2012)
End of RCC: —/13 (— 2013)
End of Project: —/14 (— 2014)
Country: China
River: Lijiang
DMS Co-ordinates: 25˚40'40.9"N, 110˚28'43.21"E
DD Co-ordinates: 25.678028, 110.478668
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|