Geliqiao
Download PDF data sheet
Geliqiao completed

Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 77 m3x106
Height: 124 metres
Length: 104 metres
Volume of RCC: unknown
Total volume: 500 m3x103
Construction Dates
Start of Project: 01/07 (January 2007)
Start of RCC: 04/08 (April 2008)
End of RCC: —/09 (— 2009)
End of Project: —/10 (— 2010)