SEARCHING
... please wait

Geliqiao

Download PDF data sheet
Geliqiao completed
Geliqiao completed

Particulars

Owner: unknown

Designer: Hydrochina Guiyang Engineering Corporation

Contractor: SinoHydro Construction Bureau Nº8 Co. Ltd.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 77 m3x106

Height: 124 metres

Length: 104 metres

Volume of RCC: unknown

Total volume: 500 m3x103

Construction Dates

Start of Project: 01/07 (January 2007)

Start of RCC: 04/08 (April 2008)

End of RCC: /09 ( 2009)

End of Project: /10 ( 2010)

Country: China

River: Qingshui

DMS Co-ordinates: 27˚0'33.67"N, 107˚12'22.45"E

DD Co-ordinates: 27.009354, 107.206238

Facings

Upstream

SlopeType
  

Downstream

SlopeType
  

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
  

Cementitious material

Cement (kg/m3)
 
Pozzolan (kg/m3)Pozzolan Type