Geliqiao
Download PDF data sheet
Particulars
Owner: unknown
Designer: Hydrochina Guiyang Engineering Corporation
Contractor: SinoHydro Construction Bureau Nº8 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 77 m3x106
Height: 124 metres
Length: 104 metres
Volume of RCC: unknown
Total volume: 500 m3x103
Construction Dates
Start of Project: 01/07 (January 2007)
Start of RCC: 04/08 (April 2008)
End of RCC: —/09 (— 2009)
End of Project: —/10 (— 2010)
Country: China
River: Qingshui
DMS Co-ordinates: 27˚0'33.67"N, 107˚12'22.45"E
DD Co-ordinates: 27.009354, 107.206238
Facings
Upstream
Slope | Type |
---|---|
Downstream
Slope | Type |
---|---|
Spillway
Slope | Type |
---|---|
Placement
Layers (mm) | Lifts (mm) |
---|---|
Cementitious material
Cement (kg/m3) |
---|
Pozzolan (kg/m3) | Pozzolan Type |
---|---|