Germinal
Download PDF data sheet
Photo coming soon

Statistics
Type: Gravity
Purpose(s): Water Supply
Reservoir capacity: 2 m3x106
Height: 28 metres
Length: 210 metres
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: —/16 (— 2016)
Start of RCC: —/18 (— 2018)
End of RCC: —/19 (— 2019)
End of Project: 08/20 (August 2020)
Country: Brazil
River: Germinal
DMS Co-ordinates: 4˚10'53.36"S, 38˚51'54.36"W
DD Co-ordinates: -4.181488, -38.865101
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
