SEARCHING
... please wait

Gov. Jayme Canet Junior (formerly Antiga Mauá)

< Back to search results

Download PDF data sheet
Gov. Jayme Canet Junior (formerly Antiga Mauá) completed
Gov. Jayme Canet Junior (formerly Antiga Mauá) completed

Particulars

Owner: unknown

Designer: VLB Engenharia

Contractor: J. Malucelli Constructores de Obra S/A, Sadefem Equipamentos E Montagens and Andritz Hydro Inepar S/A.

Statistics

Type: Gravity

Purpose(s): Hydropower

Reservoir capacity: 2 m3x106

Height: 85 metres

Length: 745 metres

Volume of RCC: 633 m3x103

Total volume: 753 m3x103

Construction Dates

Start of Project: /09 ( 2009)

Start of RCC: 01/10 (January 2010)

End of RCC: 05/11 (May 2011)

End of Project: /12 ( 2012)

Country: Brazil

River: Tibagi

DMS Co-ordinates: 24˚03'45.94"S, 50˚42'27.1"W

DD Co-ordinates: -24.062761, -50.707527

Facings

Upstream

SlopeType
VerticalTraditional concrete against formwork with external geomembrane

Downstream

SlopeType
0.80RCC against precast concrete blocks

Spillway

SlopeType
  

Placement

Layers (mm)Lifts (mm)
3002400

Cementitious material

Cement (kg/m3)
60
Pozzolan (kg/m3)Pozzolan Type
15Natural pozzolan (ASTM Class N)