Particulars
Owner: unknown
Designer: unknown
Contractor: Webuild (Salini - Impregilo SpA)
Statistics
Type: Gravity
Purpose(s): Hydropower
Reservoir capacity: 74000 m3x106
Height: 160 metres
Length: 1790 metres
Volume of RCC: 10100 m3x103
Total volume: 10500 m3x103
Construction Dates
Start of Project: 12/10 (December 2010)
Start of RCC: 05/13 (May 2013)
End of RCC: —/22 (— 2022)
End of Project: —/24 (— 2024)
Country: Ethiopia
River: Blue Nile
DMS Co-ordinates: 11˚12'55"N, 35˚05'36.16"E
DD Co-ordinates: 11.215278, 35.093056
Facings
Upstream
Slope | Type |
---|---|
0.22 | RCC against formwork (GEVR/GE-RCC) |
Downstream
Slope | Type |
---|---|
1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Spillway
Slope | Type |
---|---|
1.00 | RCC against formwork (GEVR/GE-RCC) [stepped face] |
Placement
Layers (mm) | Lifts (mm) |
---|---|
400 | 400 |
Cementitious material
Cement (kg/m3) |
---|
67 to |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
23 to | Natural pozzolan (ASTM Class N) |