Guanyin
Download PDF data sheet
Photo coming soon

Particulars
Owner: Guizhou Water Conservancy Investment Group Co, Ltd
Designer: unknown
Contractor: SinoHydro Construction Bureau Nº12 Co. Ltd.
Statistics
Type: Gravity
Purpose(s): Hydropower / Irrigation / Water Supply
Reservoir capacity: 121 m3x106
Height: 109 metres
Length: unknown
Volume of RCC: unknown
Total volume: unknown
Construction Dates
Start of Project: 12/21 (December 2021)
Start of RCC: —/23 (— 2023)
End of RCC: —/26 (— 2026)
End of Project: —/27 (— 2027)
Facings
Upstream
| Slope | Type |
|---|---|
Downstream
| Slope | Type |
|---|---|
Spillway
| Slope | Type |
|---|---|
Placement
| Layers (mm) | Lifts (mm) |
|---|---|
Cementitious material
| Cement (kg/m3) |
|---|
| Pozzolan (kg/m3) | Pozzolan Type |
|---|---|
