Guanyinge (Kwan-in-Temple)
Download PDF data sheet
Particulars
Owner: unknown
Designer: Institute of Liaoning Provincial Survey and Design of Water Conservancy and Electric Power, Liaoning Province
Contractor: JIVC (including Liaoning Construction Bureau)
Statistics
Type: Gravity
Purpose(s): Flood Control / Hydropower / Irrigation / Water Supply
Reservoir capacity: 2168 m3x106
Height: 82 metres
Length: 1040 metres
Volume of RCC: 1240 m3x103
Total volume: 1876 m3x103
Construction Dates
Start of Project: 05/90 (May 1990)
Start of RCC: 09/91 (September 1991)
End of RCC: 09/95 (September 1995)
End of Project: 10/95 (October 1995)
Country: China
River: Taizi
DMS Co-ordinates: 41˚18'50.93"N, 124˚08'55.64"E
DD Co-ordinates: 41.314148, 124.148788
Facings
Upstream
Slope | Type |
---|---|
Vertical | Traditional concrete against formwork |
0.10 | Traditional concrete against formwork |
Downstream
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Spillway
Slope | Type |
---|---|
0.70 | Traditional concrete against formwork |
Placement
Layers (mm) | Lifts (mm) |
---|---|
270 - | 750 |
280 |
Cementitious material
Cement (kg/m3) |
---|
91 |
Pozzolan (kg/m3) | Pozzolan Type |
---|---|
39 | Low-lime flyash (ASTM Class F) |